| FILE TYPE LINK LEGEND: | HTML | PPTX & PPT | XLSX | DOCX & DOC | JPG, PNG, GIF |
→ PICO Wiki ARCHIVED SITE - HOME
Telecon Notes, March 29, 2018
Attendance: Shaul, Brandon, Daniel, Mathieu, Charles, Kevin, Clem, + …
Agenda:
- Follow up maps (Clem)
- Follow up on analysis (Mathieu, Belen)
- Workshop
Notes (Shaul)
- Maps:
- Action: Clem is proceeding to make maps parallel to those that have been made for S4
- Action: Clem will include the MHD maps from Brandon
- Clem asks: include fake delensing? Make 1000 simulations? provide all components? with r or without r? Answers, after some discussion:
- yes, include delensing. Action: Shaul will check with Raphael what level of delensing to assume?;
- 50% simulations with r=0; 50% with r=??
- yes, provide analyzers all components
- Discussion on the limitations of running Commander1 which 'is limited' to \ell=50. Charles explains that Commander is not limited to \ell=50, the restriction is computing resources. Also Commander1 has a fixed resolution at all frequencies, which happens to be the lowest resolution corresponding to the lowest frequency. Commander2 can do the analysis with varying resolution. Action: Charles will check with Hans Kristian Erikson on the status of running commander2.
- Mathieu reports on his results using the delensing factor of CORE (60%).
- slides not available
- \sigma - r is reduced from 3.5e-4 to ~2e-4; see slides.
- Brief discussion of workshop plan. It would be good to have a discussion of the steps necessary to move forward. Action: Shaul will try to include in the agenda.
Last modified: 2018/04/04 10:42 by hanany
