| FILE TYPE LINK LEGEND: | HTML | PPTX & PPT | XLSX | DOCX & DOC | JPG, PNG, GIF |
→ PICO Wiki ARCHIVED SITE - HOME
Telecon Notes Sept. 16, 2021
Attendance: Shaul, Ragnhild, Jacques, Charles, Julien, Alex, Colin
Regrets:
Agenda:
- Commander update
- Delensing Alex and Colin's delensing figure (.pdf)
- Paper Tasks
=== Notes (Shaul) ===
- Commander:
- Unni has produced maps with nside=512 for 90.91, r=0 and r=0.003, 10 simulations for each. She is now doing 90.92.
- Ragnhild is analyzing 90.91. It takes time to run the code because of the higher resolution.
- Paper:
- Jacques volunteers to contribute to the introduction
- Ragnhild began describing the models. She will write also the part about the map simulations.
- Jacques will write about model98
- Clem will write about making the maps
- Request to make a clear distinction between 'Foreground Models' and 'Sky Maps'
- Clem will write the 'Foreground Models' at least for those that match S4 and the 'Sky Maps'.
- NILC and Commander techniques - cite other sources heavily. No need to repeat material described elsewhere
- Delensing Alex and Colin's delensing figure (.pdf)
- Colin ran a harmonic space ILC calculation. Gave noise value post calculation to Alex who ran an iterative delensing code.
- Deproj0 - Standard ILC, no constraints
- Deproj1 - ILC constrained to suppress a dust SED
- Deproj2 - ILC constrained to suppress synchrotron SED
- Deproj3 - ILC constrained to suppress both
- Note: everything done in harmonic space. So no spatial information about dust or synchrotron distribution
- Discussion ensues with MR about what level of delensing he should use.
Last modified: 2021/09/22 21:21 by hanany
