Telecon 20170828
Agenda:
- Where we are (Shaul) (.pdf)
- Scan Angles (Kris) (.pdf)
- Noise model Noise model status (.pdf) (Karl)
Notes: Attending: Shaul, Amy, Brian, Kris, Julian, Karl, Qi, Brad, Roger, Jacques, Bill
pre meeting comments:
- Roger working on getting FDM power consumption and 1/f characteristics from Matt Dobbs.
Current status (Shaul)
- flow chart indicates various areas of work and
- Preliminary, to see where we are and illustrate how different parts interact
Noise Model (Karl)
- White noise level only.
- NEPs and NET have been calculated
- Readout was from EBEX, more information of readout system is needed for estimation of noise in near future
- Photon correlation noise = 1
- probably needs to be investigated
- different for space and ground-based missions
- Thermal power law index n: 2 is more proper
- Zodiacal light might be included
- negligible in terms of loading from simulation (Jacques)
- galaxy also negligible in terms of loading
- 10 ms bolo time constant does NOT matter here
- P_readout > P_photon at lowest bands near 20 GHz
- Next steps:
- go from single detector —> multi-chroic —> full focal plane
- Roger to use his model to calculate noise and cross check on 1 week timescale
- 1 / f needs to be modeled as well
- Roger will lead collection of information, check in at 2 weeks.
- Julian has machinery to simulate given a noise spectrum.
- correlated noise will need more inputs
- data from Plank for satellite related issues
- data from SPT, BICEP, etc for crosstalk numbers.
- for TDM capacitance of wiring is critical to limit noise
- what are key points for FDM?
Scanning (Kris)
- basic model of single pixel with completely smooth scan.
- ability to reconstruct polarization maps looks reasonable, but Kris not convinced
- more complete models with multiple detectors, and a plan for how to combine them is needed.
- some of the has been done for CORE and LightBIRD.
- Kris to look into these papers
- Jacques to ask European community what they can contribute and what time availability they have. ETA 1 week.
- Kris-Jacques will meet Sept. 18-19 to discuss face-to-face.