| FILE TYPE LINK LEGEND: | HTML | PPTX & PPT | XLSX | DOCX & DOC | JPG, PNG, GIF |
→ PICO Wiki ARCHIVED SITE - HOME
Telecon 20180620
Attending: Jamie, Brian, Tom, Shaul, Qi
Notes by : Qi
Agenda
- Mechanical design of focal plane (.pdf) (Qi)
- 2-year, 4 detector, simulated maps available - next steps? (Kris)
- Report Writing (.pdf)
- Remaining key open areas: Thermal Design (JPL); Changing telecons to a lower cadence: two weeks?
Notes
Mechanical design of focal plane
- Jamie shared the experience with Bicep3 focal plane:
- heat sink: gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help.
- 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments.
- In theory, gold wires and bars play the role of RF shields.
- PICO has a preliminary design, which can be used to estimate the mass already; more details about how to mount wafers on frames are ongoing
- material of frame: copper vs invar? Jamie: invar has high capacity, large mount of magnetic material
- bump bonds should be straightforward on PICO time scale
- Karl knows the size of TDM, Qi to find out what Karl has concluded (AI)
Report writing
- page 4, section 3 Instrument is most relevant
- internal review
- by the end of August
Thermal design
- we don't have one yet, JPL is responsible.
No objection against changing the telecon cadence to 2 weeks.
Last modified: 2018/06/20 17:04 by wenxx181
