Please
click on each image to see a larger view!
|
|
|
|
|
The
bottom gondola during final assembly.
|
|
|
|
Bottom
gondola going to launch pad. |
Topping
of the cryogens in the dewar. |
Top
telescope package on the way to the launch pad. |
|
|
|
Top
package at the launch pad. |
Inspecting
cables for crane hook-up. |
Spool
for launch being prepared for the balloon. |
|
|
|
Bottom
gondola at the launch pad. |
Stephan
holding the test wires for the top package. |
Top
package being removed from sled. |
|
|
|
Balloon
being removed from sled and placed through the spool. |
|
|
|
|
Tow
balloon being inflated and lifting the top package.
|
|
|
|
|
|
|
Launch
count down. Tow balloon being released and then waiting
for a plane to land. Now all is ready and release
and it is launched. We have lift off. |
|